Installation of process piping
- Installation of process piping and installation of process equipment at Sulfuric Acid Unit of Titan Plant JSC "Crimean Titan" Armyansk.
- 10” interplant gasmain construction, 1”-14” process gas piping construction of rotary furnace at Metallurgic Plant “Interpype Niko Tube”, Nikopol’, Dnipropetrovsk region (General contractor Techmash LTD)
- Construction of CS and Alloy process piping with diameter from ¾” to 22” during construction extracting and preparation CPF, at the Delta Wilmar CIS factory, Yuzhny, Odessa region.
- 32”-48” Piping works in the mountains, within construction of hydropower plants in the Carpathian Mountains.
- 1”-12” Alloy process pipes construction for transportation of liquid air, nitrogen, oxygen; 1”-48” CS process pipes and 1-10” creep-resistant pipesteam construction at the Air Separation Plant, «Linde Gas Ukraine», Krivoy Rog.
- Weld repair on chlorine pipeline in the place of blowhole, replacement of steam pipelines, removal and installation of safety valves on steam pipeline - “Kremenchuk dairy plant”.
- Installation of 219 mm diameter pipelines at expansion of liquid cargoes tank farm - customer JV Risoil Terminal LLC, Chernomorske town, Odessa oblast.
- Installation of technological pipelines, installation of metal structures of the TSA at the facility "Construction of a complex of machines for continuous casting of workpieces # 4 at PJSC "MMK named Ilyich", Donetsk region, Mariupol city;
- Manufacturing and installation of technological pipelines at the project "Capital repair of blast furnace # 3”. PJSC "MK Azovstal", Donetsk region, Mariupol;
- Installation of technological pipelines at the object "Reconstruction of the continuous casting department with the installation of a complex of machines for continuous casting of workpieces # 2 and # 3", PJSC "ArcelorMittal Kryviy Rih", Dnipropetrovsk region, Kryviy Rih city.
Fabrication and installation of tanks
- Installation of bitumen storage tanks capacity 1000 m3 (pre-fabricated by roll) and process equipment, construction of process piping, during construction of bitumen plant in Iasi Romania
Erection of steel structures and special equipment
- 2019-04-25Contract-supervising equipment of siloses, flat-belt and chain conveyers, norias, pre-fabricated steel structure by AGI (Canada);
- Erection of silos 5000 and 2000 tons manufactured by "SCAFCO" USA, erection of endless belt conveyor, creeper and elevators designed by "Cimbria", erection of hot air-drier designed by "Mathews", Koroventsi village, Zhytomyr region, Kozatske village, Kherson region, Pereyaslav-Khmelnitsky town, Kyiv region for Nibulon LTD;
Подробнее: Erection of steel structures and special equipment